NA2XSY Aluminium Conductor XLPE PVC - 6/10 (12)kV Cable | ||
Voltage: | 6/10 (12)kV | |
Structure: | Conductor | Class 2 stranded aluminium conductor |
Insulation | XLPE (Cross-Linked Polyethylene) | |
Screen | Copper wires | |
Jacket | PVC (Polyvinyl Chloride) |
Medium voltage cables for distribution networks; also for connection to generation units and plant and process connection. To be laid directly in ground, outdoors, indoors and in cable ducts.
6/10 (12)kV
Fixed: -20°C to +90°C
15 x overall diameter
IEC 60502-2, EN 60228,
Flame Retardant according to IEC/EN 60332-1-2
Class 2 stranded aluminium conductor
Semi-conductive material
XLPE (Cross-Linked Polyethylene)
Semi-conductive material
Copper wires
PVC (Polyvinyl Chloride)
NO. OF CORES | NOMINAL CROSS SECTIONAL AREA mm2 | NOMINAL OVERALL DIAMETER | NOMINAL WEIGHT | |
Conductor | Copper Wire Screen | mm | kg/km | |
1 | 35 | 16 | 28 | 700 |
1 | 50 | 16 | 29 | 750 |
1 | 70 | 16 | 31 | 850 |
1 | 95 | 16 | 32 | 950 |
1 | 120 | 16 | 34 | 1050 |
1 | 150 | 25 | 35 | 1300 |
1 | 185 | 25 | 37 | 1400 |
1 | 240 | 25 | 39 | 1650 |
1 | 300 | 25 | 40 | 1850 |
1 | 400 | 35 | 45 | 2300 |
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
Generally, we can deliver regular machines to customers immediately within 7-30 days.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
We have world-class testing facility, and made rigorous testing regime, every meter of cable before leaving the factory must go through strict testing, testing qualified products will be shipped to customers, effectively ensure product quality and meet customer requirements.
Guowang Cable Group actively implements the "carbon reduction" goal, strives to promote the green's low-carbon transformation, strengthens energy-saving and emission reduction technology innovation, and promotes the company's healthy and sustainable development.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
Generally, we can deliver regular machines to customers immediately within 7-30 days.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.