[list:title]
[list:title]
N2XS2Y 18/30 (36)kV Cable
Voltage:18/30 (36)kV 
Structure:ConductorClass 2 Stranded Copper
InsulationXLPE (Cross-Linked Polyethylene)
ScreenCopper wires with Open Helix Copper Tape Screen
JacketMDPE (Medium Density Polyethylene)



  • Overview
  • Specifications
  • FAQ
  • Test&Acceptance
  • Contact Us

APPLICATION 

Medium voltage power cables for distribution networks and generation units, suitable for external installation including direct buried and in buried cable ducts. UV Resistant.

CHARACTERISTICS 

Voltage Rating Uo/U 

18/30 (36)kV

Temperature Rating 

Maximum conductor operating temperature:90°C

Initial temperature at S.C.C for metallic screen:80°C

Maximum conductor temperature during S.C: 250°C

Minimum Bending Radius 

20 x overall diameter

STANDARDS 

IEC 60502-2, IEC 60228,

UV Resistant

CONSTRUCTION 

Conductor 

Class 2 Stranded Copper

Conductor Screen 

Semi-conductive material (Bonded type)

Insulation

XLPE (Cross-Linked Polyethylene)

Insulation Screen

Semi-conductive material (Strippabe type)

Screen 

Copper wires with Open Helix Copper Tape Screen

Outer Sheath

MDPE (Medium Density Polyethylene)


NO.
OF
CORE
NOMINAL CROSS
SECTIONAL AREA
NOMINAL SCREEN CROSS
SECTIONAL AREA
NOMINAL
INSULATION
THICKNESS
NOMINAL
SHEATH
THICKNESS
NOMINAL
OVERALL DIAMTER
NOMINAL
WEIGHT
mm2mm2mmmmmmkg/km
150168231.4 1203 
170168233.2 1443 
1951682.134.5 1715 
11201682.135.9 1979 
11502582.237.9 2377 
11852582.239.4 2735 
12402582.3 42.0 3349 
13002582.444.6 3958 
14003582.547.6 4914 
15003582.651.2 5952 
16303582.756.1 7429 
18003582.860.49265


  • HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?

    Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours. 

  • HOW IS YOUR DELIVERY TIME?

    Generally, we can deliver regular machines to customers immediately within 7-30 days.

  • HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?

    Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours. 


1.Sampling Tests

Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;The sheathed average thickness and thinnest point

2.Type test items

Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;the sheathed average thickness and thinnest poin;change rate of tensile strength and elongation of insulation and sheath before and after aging;insulated wire core withstand voltage test;hot extension test;ozone resistance test;finished cable flexure test, etc.

Acceptance Check

1.The purpose of the performance acceptance test is to verify whether all the performance of the contract products meet the requirements
2.The location of the performance acceptance test is the purchaser’s site
3.The performance acceptance test shall be carried out within 6 months after the 168-hour full load trial operation of the product, and the specific test time shall be determined by both parties through negotiation.
4.Installation of measuring points, primary components and local instruments required for performance acceptance test shall be provided by the supplier and cooperated by the demander. The supplier shall also provide the technical cooperation and personnel cooperation required for the test.
5.Content of performance acceptance test
In accordance with supplier quality assurance and test requirements.
6.Criteria for performance acceptance test
In accordance with supplier's quality assurance and test requirements.
7.The performance acceptance test shall be conducted by the demander and participated by the supplier. The test program shall be provided by the demander and determined after discussion with the supplier. The specific test shall be completed by the testing department approved by both parties.
8.Confirmation of performance acceptance test results
The performance acceptance test report shall be prepared by the testing unit, and the conclusions of the report shall be accepted by both parties. If there is any disagreement between the two parties on the results of the test, the two parties shall settle it through negotiation. If no agreement can be reached, it shall be submitted to the superior departments of both parties for negotiation.
9.When a performance acceptance test is conducted, if a party fails to send personnel to participate in the test after receiving the test notice from the other party, it shall be deemed to have agreed to the acceptance test results.

Manufacture Supervision

1.Supervise manufacturing basis
Refer to the former Ministry of power Industry, Ministry of Machinery Industry issued by the electricity Office (1995) No. 37 "Interim Provisions for the quality supervision of large power equipment", "General representative group working Regulations in large power equipment manufacturers"
2.Manufacturing supervision method
Document witness, on-site witness and shutdown pending inspection, namely R point,W point , and H point.
After each manufacturing supervision content is completed, the supplier and the manufacturing supervision representative will complete the signature procedures on the witness form. The supplier shall submit one copy to the demander's manufacturing supervision representative.
R point:The supplier only needs to provide items of inspection or test records or reports, that is, document evidence.
W point:Inspection or test items attended by the purchaser’s manufacturing supervision representative, i.e. on-site witness
H point: When the supplier stops to wait for the inspection or test of the buyer's supervision representative, that is, the project is stopped for inspection.
Upon receipt of the witness notice, the demander shall promptly send a representative to the site of the supplier's inspection or test to participate in on-site witness or stop work for inspection. If the representative of the demander cannot attend on time, point W can be automatically converted to point R, but if point H is not agreed to be converted to point R by written notice of the demander, the supplier will not transfer to the next process and agree with the demander to change the witness time. If the buyer is still unable to participate on time after the change, the H point will be automatically converted to R point.
3. Requirements for suppliers to cooperate with manufacturing supervision
3.1 The supplier has the obligation to cooperate with the demander's manufacturing supervision and provide relevant information in a timely manner without incurring any costs.
3.2 The Supplier shall provide the demander's supervision representative with the convenience of work and life
3.3 The supplier shall inform the Buyer's representative of the equipment supervision project and time before witnessing the site or stopping work for inspection..
3.4 Demander's supervision representative has the right to check (borrow) the technical information related to the contract supervision equipment. If demander considers it necessary to copy and file, the supplier shall provide convenience.
3.5 The supplier shall provide the inspection and test records and reports to the supervision representative of the demander after the witness.

Hot Products

FAQ
  • Q
    HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
    A

    Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours. 

  • Q
    HOW IS YOUR DELIVERY TIME?
    A

    Generally, we can deliver regular machines to customers immediately within 7-30 days.

  • Q
    HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
    A

    Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours. 


inquiry
Name
Phone Number
Company
Message

Home WhatsApp Mail Inquiry