BS 7870-4.10 MDPE 6.35/11 (12)kVCable | ||
Voltage: | 6.35/11 (12)kV | |
Structure: | Conductor | Class 2 Stranded Copper |
Insulation | XLPE (Cross-Linked Polyethylene) | |
Screen | Copper Wires And Open Helix Copper Tape | |
Jacket | MDPE (Medium Density Polyethylene) |
Medium Voltage cable for power distribution and power supply stations used in Utility and Industrial applications, for the rated voltage of 6.35/11 (12)kV.
6.35/11 (12)kV
Maximum conductor operating temperature: +90ºC
Initial temperature at S.C.C for metallic screen: +80°C
Maximum conductor temperature during S.C: +250ºC
Maximum screen temperature during S.C: +150ºC
20 x overall diameter
BS 7870-4.10, BS EN 60228, HD620 S2 Part 10O / 11O
Class 2 Stranded Copper
Semi-conductive extruded XLPE (Cross-linked Polyethylene) (Bonded)
XLPE (Cross Linked Polyethylene)
Semi-conductive extruded XLPE (Cross-linked Polyethylene) (Strippable)
Semi-conductive waterblocking tape
Copper Wires And Open Helix Copper Tape
Non-conductive waterblocking tape
MDPE (Medium Density Polyethylene)
NO. OF CORE | NOMINAL CROSS SECTIONAL AREA | NOMINAL INSULATION THICKNESS | NOMINAL SCREEN SECTIONAL AREA | NOMINAL SHEATH THICKNESS | NOMINAL OVERALL DIAMETER | NOMINAL WEIGHT |
mm2 | mm | mm2 | mm | mm | kg/km | |
1 | 70 | 3.4 | 35 | 1.34 | 27.6 | 917 |
1 | 95 | 3.4 | 35 | 1.43 | 29.3 | 1020 |
1 | 120 | 3.4 | 35 | 1.43 | 30.7 | 1122 |
1 | 150 | 3.4 | 35 | 1.51 | 33.1 | 1260 |
1 | 185 | 3.4 | 35 | 1.51 | 34.0 | 1378 |
1 | 240 | 3.4 | 35 | 1.6 | 36.6 | 1581 |
1 | 300 | 3.4 | 35 | 1.68 | 39.1 | 1810 |
1 | 400 | 3.4 | 35 | 1.77 | 42.0 | 2143 |
1 | 500 | 3.4 | 35 | 1.85 | 45.5 | 2521 |
1 | 630 | 3.4 | 35 | 1.94 | 49.8 | 3067 |
1 | 800 | 3.4 | 35 | 2.02 | 54.8 | 3749 |
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
Generally, we can deliver regular machines to customers immediately within 7-30 days.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
We have world-class testing facility, and made rigorous testing regime, every meter of cable before leaving the factory must go through strict testing, testing qualified products will be shipped to customers, effectively ensure product quality and meet customer requirements.
Guowang Cable Group actively implements the "carbon reduction" goal, strives to promote the green's low-carbon transformation, strengthens energy-saving and emission reduction technology innovation, and promotes the company's healthy and sustainable development.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.
Generally, we can deliver regular machines to customers immediately within 7-30 days.
Our team is available 24/7 to respond to customer inquiries and issues. Most issues can be resolved within 8 hours.